Russian projects

Name of power plant Location of power plant Total output of power plant Number and type of equipment of power units (pcs. x type) Parameters upstream of turbine plant Beginning of commercial operation
Boiler Turbine Pbar To C
Thermo-Electric
Plant of ZIL motor works
Moscow 160 MW
Hot water
660 Gcal/hr
Steam 300 t/hr
3xBKZ-320-170GM
2xPTVM-100
1xT-100/110-130-5 127.5 540 1981
Thermo-Electric
Plant-3
Ivanovo 330 MW
Hot water
1584 Gcal/hr
5xTP-87
2xPTVM-100
2xKVGM-100
1xPT-60-130
1xT-110/120 -130
1xPT-80/100-130/13
127.5
127.5
127.5
540
540
540
1991
Thermo-Electric
Plant-2
Rehabilitation
Ivanovo 184 MW
Hot water
480 Gcal/hr
Steam 508 t/hr
6xTP-170
2xBKZ-220-160
2xPTVM -100
3xPT-25/30-90/10M
1xR-50-130(90)/11
1xPT-60-90/13
88.3
127.5
127.5
500
540
540
1980-1992
Novo-Voronezhskaya
Nuclear Power Plant. The second circuit of Unit No.5
Novo-Voronezh (12500)
1000 MW
Reactor of type
VVR-1000
2xK-500-65/1500 63.8   1981
Kostroma TPS Update of Monitoring and Control Systems for Units I-VIII Kostroma region, Volgorechensk 3600
8 x 300
1x1200
TGMP-114 K-300-240
K-1200-240
235.5 540 1989
Dzerzhinsk Heating and Power Plant Modification of the boilers for gas burning  Gorky region
Dzerzhinsk  town
590 MW 1xTGM-88
2xBKZ-420-140
4x-420-140NGM
4xPTVM-180
1xP-50/130-13
1xT-100/130
2xPT-135/165-130/15
127.5
127.5
127.5
540
540
540
 
Thermoelectric Plant-2. Extension of TEP. Redesign Kostroma 170 MW 4xBKZ-210-140
4xPTVM-100
1xPT-60-130
1xT-110/120-130
127.5 540 1991-1992
Heating and Power Plant No.20 Basic equipment modernization Moscow 690 MW
Hot water 2405 Gcal/h
3xTP-170
3xTP-230
5xTP-87
3xPTV-100
5xPTVM - 100
2xP -180
1xTGM-84B
4xPT-25-4
1xPT-60-90
4xT-100/130
1xT-100/130
88.3
88.3
127.5
127.5
500
500
540
540
1986-1989
Thermoelectric Plant-2 Extension Lipetsk 515 MW
Hot water 1900 Gcal/h
3xTGM-96B
3xTGME-464
2xPTVM -180
2xKVGM -180
1xPT-135/160-130/15
2xPT-80/100-130/13
2xT-110/120-130/13
127.5
127.5
127.5
540
540
540
1978-1991
Cherepetsk TPS Rehabilitation, Units I-IV   Tula region Suvorov town  1800 MW
63 Gcal/h
7xTP-240-1
1xTP-51
2xTPP-100
1xP-50J
4xK 150/1
3K 300/240-1
170.0
240.0
550/520
560/565
1991-1997
Heating and Power Plant No.1 Rehabilitation Ivanovo 30 MW
Steam - 200 t/h
Hot water - 200 Gcal/h
2xGM-50+4xKVG-3GM
2xE-50-3.9-440GM
8xDE-25-1.4-225 GM
2xR-12/35+1xR-6/35 39 425 2001
IvGRES TPS
Modification for working as a District Heating Plant

Ivanovo region Komsomolsk town

60 Gcal/h

2xGM50-1,4
      2000
North-West combined-cycle power plant. Evaporator plant, Condensate polishing plant, I&C of auxiliary plants St.Petersburg 450 MW 4xKU273/61-8,0/0,65 2xT-150-7,7
4xV 94,2
77/6 522/199 2001
Mutnovskaya
Geothermal
PowerPlant.
Units 1 & 2
Petropavlovsk-Kamchatsky 2x25 MW - 2xK-25-06Geo 6.5 161 2002
Gas-Turbine Power Plant of Central Processing Facilities of Yuzhno-Shapkinsky Oil Field Komi Republic, Usinsk City 4x6   4xGTU-6RM - - 2004
Combined Cycle Power Plant for Rodnikovskaya Generation Company Ivanovo region,
Rodniki Town
12 MW - - - - 2008
Tereshkovo GTPP - Combined Heat and Power Plant Moscow 170 MW
150 Gcal/h
3xHeat Recovery Steam Generators by Aalborg (Denmark) 1 x Steam Turbine MTD 40CE, Skoda (Czechia)
3xGas Turbine GE LM 6000 PD Sprint (USA)
4.5 463 2008
Kojuhovo GTPP - Combined Heat and Power Plant Moscow 170 MW
270 Gcal/h
3xHeat Recovery Steam Generators by Aalborg (Denmark)
2xPeak-load hot water boilers PTVM-60, Drogobuzhkotlomash (Russia)
1 x Steam Turbine MTD 40CE, Skoda (Czechia)
3xGas Turbine GE LM 6000 PD Sprint (USA)
4.5 463 2008
Yuzhnaya CHP-22 St.Petersburg 450 MW Pr-228/47-7,86/0,62-515/230 1x Steam Turbine T-125/150-7,4
1x Gas Turbine GTE-160
7.26 514.1 2009
Extension of Cherepetskaya thermal power plant, Units No.8 & 9 Suvorov town
Tula region
2 x 225 MW Coal-fired boiler 2 x Ep-630-13,8-565/570
(Taganrog branch of EM Alliance)
Steam turbine 2 x K-225-12,8-4P (Power Machines C LMZ) 130 561 2012,2013
CCPP - CHP
GSR-Energo
Kolpino
St. Petersburg,
Kolpino
2 x CCPP 110MW / ~77 Gkcal/h Two double pressure HRSG
horizontal type, 116 t/h / 16t/h (Machine-building plant ZIO-Podolsk)
Two gas turbines PG6111FA of GE 77.4 MW
Two steam turbines T x 25/33-7.7 / 0.12
Kaluga turbine plant
33/25 MW / ~71 Gkcal/h
Gas turbine SGT5-4000F 278.5MW of Siemens;
34 (g)HP steam
76.2 LP steam
6.3
27 HP steam
531
HP steam
216
2011,2014
420-T combined cycle
power plant for
thermoelectric plant
No.20 - Affiliate of Mosenergo
Moscow CCPP 420 MW
/~220 Gkcal/h
Three-pressure HRSG
(Machine-building plant ZIO-Podolsk)
One (1) gas turbine plant
CGTS-4000F
("Siemens")
Cogeneration steam turbine SST5-5000~140MW / ~220 Gkcal/h (Siemens)
30.2 (g)HPsteam-119
hot reheat steam-29
LP steam - 4.2
60-130 LP steam-535
hot reheat steam-535
LP steam-232
2014
Novomoskovskaya GRES
extension
Novomoskovsk,
Tula
CCPP 190 MW / ~110 Gkcal/h Double pressure HRSG,
horizontal type 188t/h
/ 34 t/h (ZIOMAR, Podolsk)
Gas turbine PG 9171E 126.1 MW (GE, USA)
Steam cogeneration turbine SST-600 62/42 MW / ~100 Gkcal/h (Siemens)
26.6-30 (g HP steam-70.5
LP steam-6.5)
27 HP steam-
505
LP steam-
213
2011
Tomskaya GTP-16 Tomsk GTP 16 MW Hot-water boiler
100 Gkcal/h
Gas turbine
16 MW
- 27 2012